|
Post by janee on Jul 26, 2012 4:51:51 GMT -5
1. Dismantle adjusting sleeve first. 2. Twist the lifting bolt of the principle axis to the upper end. 3. Lift up the cone crushing part from the cone crusher by the hoisting equipment on the spot. 4. Check all the burnishing surface of the machine body and the principle axis. 5. To operate the crushing wall on a reasonable height, it's better to open a hole in the land or floor so as to place the crushing part. And this hole should be dewatering. More info,please refer to www.zdcrusher.com
|
|